Asurion NHQ – Site Lighting

Asurion, LLC is a privately held company based in Nashville, Tennessee that
provides device protection and services for consumer electronics and other
services. The company operates in 18 countries and has 49 offices worldwide
with 16,000 employees serving 290 million consumers.

The Graybar Power Smart team joined forces with Nashville based Stones
River Electric for an Asurion request for proposal and award for all their
North America facilities. The power of Graybar with nationwide distribution
facilities and purchasing power, combined with the nationwide design and
installation services of Stones River provides a great team.

GraybaR
Stones River Electric
Asurion

Stones River Electric is a national provider of electrical, lighting and energy
services. Stones River Electric provides the power of self-performing
experience in the design, installation, management and maintenance of
facility lighting, electrical and energy management systems to achieve
significant energy cost savings and more efficient facility operations. Graybar
Power Smart Solutions is the efficiency team within Graybar, a Fortune 500
company, specializing in supply chain management services and is a leading
North American distributor of high-quality components, equipment and
materials for a number of industries.

The first project for this team was to design a new site lighting system for a
Nashville, Tennessee location. The client desired the maximum operational
cost savings while utilizing LED technology and redesigning the system to
their current needs. The design focused on safety and security for the
occupants while meeting all Illuminating Engineering Society’s (IES) design
criteria along with Design Lights Consortium Standards and local energy
codes to ensure compliance. The new design utilized products from Lithonia
and Accendo lighting and maximized all available utility rebates.

Measurement and Verification standards were utilized to compare the
existing and new systems performance. The existing light levels in the
parking lots were raised slightly as compared to the existing metal halide
lighting system. However with the much improved light distribution with
the LED luminaires, the visual perception of the area is greatly improved.
Wattage readings were also taken on the existing and newly installed systems
that verified 76% energy savings in the parking areas.

The connected load for the first phase project was reduced from 113 kW
down to a frugal 47kW. Additionally, kWh usage was reduced from 578,803
to 374,169. Theese energy savings alone resulted in an annual cost savings for
the client in excess of $37,000 annually. The entire phase one project along
with a substantial utility rebate resulted in a 35% ROI for the client.

The Stones River Electric and Graybar Power Smart Team have already began
the next project with Asurion to install a new interior LED system.

Asurion

Before & After

Use slider to see a comparison of before/after

Asurion Before Site LightingAsurion After Lighting Upgrade
Asurion Before Lighting UpgradeAsurion After Lighting Upgrade
Asurion Before Lighting UpgradeAsurion After Lighting Upgrade
Stones River Electric

P: 615.885.0019 | F: 615.883.0988 |  A: 1244 Gallatin Pike South, Madison, TN 37115

GET IN TOUCH FOR ALL QUOTES, SERVICE CALLS AND GENERAL INQUIRIES